Snakeholme Lock Chamber Pictures

Pictures 19th October 2001 Work Commences
Pictures 5th November 2001 Completion of the Top Gates
Pictures 5th & 6th November 2001 Fitting the Bottom Lock Gates
Pictures 6th November 2001 Gates in Place
May be slow to load (6 pictures)
Bottom chamber
Looking under the bridge into the bottom lock chamber.
Top Chamber down
Looking down the lock from the top sill from behind the fixed stop planks.
Clearing out
Cleaning out at the top chamber bottom sill.
Top Chamber up
Looking up the top lock chamber.
Top gates and sill
Up against the top sill looking through the fixed stop planks at the top gates.
Top gates
The top gates viewed from the sill.
Last set of Pictures, Return to:-
Pictures 19th October 2001 Work Commences
Pictures 5th November 2001 Completion of the Top Gates
Pictures 5th & 6th November 2001 Fitting the Bottom Lock Gates
Pictures 6th November 2001 Gates in Place

     